CAMP
Reconstruction / new construction of bridges on the roads to high mountain pastures
Bridge location:
|
The bridge is located in north of Karakol city.
Corresponding number on the general plan: ¹ 71.
Administrative area: National nature park of Karakol.
River name: Karakol.
|
Actual condition of the bridge/road |
The old bridge was constructed in 1992 by workers of local forestry. The existing concrete pier is needed to improve by stones. |
Coverage of high mountain pastures |
The bridge cover about 1 000 ha of woodlands and high mountain pastures. The location is used for grazing, haying and forest tree nursery. The entire location is at 2 000 m above sea level. |
Actual users on the location |
The main users of the bridge are: local people of two villages Chelpek and Borubash and Karakol city. |
Other potentialities for the use of the location |
With renovated bridge there are potentialities for beekeeping, harvesting of medicinal herbs and developing of tourism. |
Bridge operation |
The daily carrying capacity of the bridge and the road is 7 – 8 cars (Ural, GAZ-53, KAMAZ, UAZ-452, UAZ-469, tractor), trucks; it is also used for passers-by, including tourists, and horse riders. |
Budget review |
Budget item |
Costs in US$ |
Machinery: |
423,00 |
Wood (was supplied by local forestry) |
769,00 |
Materials: |
64,00 |
Overheads: |
51,00 |
Wages: |
329,00 |
Travel: |
50,00 |
Development and survey works: |
355,00 |
Total: |
2041,00 |
Exchange rate of Som/US$: 39,00/1
Costs were covered by users themselves account for US769,00$ |
Project evaluation by the CAMP |
Appendix |
- Location plan (outline)
- Detailed budget in soms
- Additional photographs
- Agreement regarding the activities to be implemented by users themselves
|
|