Reconstruction / new construction of bridges on the roads to high mountain pastures

 

Bridge location

The road from Ak-Terek village to “Balchelek” site of Jety-Oguz rayon.

Corresponding number on the general plan: ¹ 7.

Name of aiyl okmotu: Ak-Terek aiyl okmotu

River name: Kyrgoo-Suusu.




Actual condition of the bridge/road

The bridge bearing pillar and the span construction have been fully destroyed. New construction is required.

Coverage of high mountain pastures

The road and the bridge cover 4 000 ha of woodlands and mountain pastures. It is used for grazing, haying and logging. The entire territory is located at 2 250 m above sea level.

Actual users on the location

The main bridge users are: Ak-Terek aiyl okmotu, Jety-Oguz forestry, local community of Ak-terek village.

The total number of the main users is 5 farms.

Other potentialities for the use of the location

With the bridge and road being repaired there will be new potentialities for bee keeping, harvesting of medicinal herbsand the development of tourism and stock-breeding.

Bridge operation

The daily carrying capacity of the bridge is 10 cars (Niva, UAZ), trucks of 15 tons, four – five times a year the bridge is used for livestock migration, it is also used for passers-by and horse riders.

 

 

 

Budget review

Budget item

Costs in US$

Machinery:

249

Materials:

333

Overheads:

98

Planned accumulations:

99

Wages:

76

Taxes:

227

Travel:

43

Development and survey works:

224

Total:

1348

 

 

Exchange rate of som/US$: 48/1

Costs to be covered by users themselves account for 692$

Project evaluation by the CAMP

 

Appendix

  1. Location plan (outline)
  2. Detailed budget in soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves