CAMP
Reconstruction / new construction of bridges on the roads to high mountain pastures
Bridge location: |
The bridge is located in the east of the Aksuu village in the Ichkezhergez canyon.
Corresponding number on the general plan: № 57.
Administrative area: Aksoo raion of Issykkul oblast.
River name: Ichkezhergez |
Actual condition of the bridge/road |
Construction of new wood bridge with the length 10 m, the width 5 m and the height 1,8 m across the Ichkezhergez river finished. |
Coverage of high mountain pastures |
The bridge cover about 1 000 ha of woodlands and high mountain pastures. The location is used for grazing, haying and forest tree nursery. The entire location is at 2 300 m above sea level. |
Actual users on the location |
The main users of the bridge are: population of Bozuchuk and Ichkezhergez villages and Aksoo forestry and tourists. |
Other potentialities for the use of the location |
With a new bridge there are potentialities for different income generating activities as beekeeping, harvesting of medicinal herbs and the development of the forest tree nursery. |
Bridge operation |
The daily carrying capacity of the bridge is about 10 cars (Ural, GAZ-53, KAMAZ, UAZ-452, UAZ-469, tractor), trucks of 15 tons; it is also used for passers-by and horse riders. |
Budget review |
Budget item |
Costs in US$ |
Machinery: |
538,00 |
Wood (was supplied by local forestry) |
986,00 |
Materials |
94,00 |
Wages: |
291,00 |
Development and survey works: |
360,00 |
Total: |
2269,00 |
Exchange rate of Som/US$: 42,6/1
Costs were covered by users themselves account for US1491,00$ |
Project evaluation by the CAMP |
Appendix |
- Location plan (outline)
- Detailed budget in Soms
- Additional photographs
- Agreement regarding the activities to be implemented by users themselves
|
|