CAMP

Reconstruction / new construction of bridges on the roads to high mountain pastures

 

Bridge location:

The bridge is located in the east of the Aksuu village in the Ichkezhergez canyon.

Corresponding number on the general plan: № 57.

Administrative area: Aksoo raion of Issykkul oblast.

River name: Ichkezhergez


 



 

Actual condition of the bridge/road

Construction of new wood bridge with the length 10 m, the width 5 m and the height 1,8 m across the Ichkezhergez river finished.  

Coverage of high mountain pastures

The bridge cover about 1 000 ha of woodlands and high mountain pastures. The location is used for grazing, haying and forest tree nursery. The entire location is at 2 300 m above sea level.

Actual users on the location

The main users of the bridge are: population of Bozuchuk and Ichkezhergez villages and Aksoo forestry and tourists.

Other potentialities for the use of the location

With a new bridge there are potentialities for different income generating activities as beekeeping, harvesting of medicinal herbs and the development of the forest tree nursery.

Bridge operation

The daily carrying capacity of the bridge is about 10 cars (Ural, GAZ-53, KAMAZ, UAZ-452, UAZ-469, tractor), trucks of 15 tons; it is also used for passers-by and horse riders.

 

Budget review

Budget item

Costs in US$

Machinery:

538,00

Wood (was supplied by local forestry)

986,00

Materials

94,00

Wages:

291,00

Development and survey works:

360,00

Total:

2269,00

Exchange rate of Som/US$: 42,6/1

Costs were covered by users themselves account for US1491,00$

Project evaluation by the CAMP
Appendix
  1. Location plan (outline)
  2. Detailed budget in Soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves