CAMP

Reconstruction / new construction of bridges on the roads to high mountain pastures

 

Bridge location:

The bridge is situated in the north of Taldysuu village in the Taldysuu canyon. There are 8 km between the bridge and Taldysuu village.

Corresponding number on the general plan: № 53.

Administrative area: Tyup raion of Issykkul oblast.

River name: Taldysuu.

 
 

 

Actual condition of the bridge/road

There is necessary to construct a new wood bridge for  preparing timber and having an access to the high mountainous regions.

Coverage of high mountain pastures

The bridge cover about 1 200 ha of woodlands and high mountain pastures. The location is used for grazing, haying and forest tree nursery. The entire location is at 2 300 m above sea level.

Actual users on the location

The main users of the bridge are: local population of Taldysuu and Ichkesuu and other below located villages.

Other potentialities for the use of the location

With the renovated bridge there are potentialities for different income generating activities as beekeeping and the development of the forest tree nursery.

Bridge operation

The daily carrying capacity of the bridge is about 15 cars (Ural, GAZ-53, KAMAZ, UAZ, tractor), trucks of 15 tons; it is also used for passers-by, including tourists, and horse riders.

 

Budget review

Budget item

Costs in US$

Machinery:

389,00

Wood (was supplied by local forestry)

892,00

Materials

118,00

Overheads:

50,00

Wages:

503,00

Travel:

50,00

Development and survey works:

400,00

Total:

2402,00

Exchange rate of Som/US$: 42,6/1

Costs were covered by users themselves account for US1351,00$

Project evaluation by the CAMP
Appendix
  1. Location plan (outline)
  2. Detailed budget in Soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves