CAMP
Reconstruction / new construction of bridges on the roads to high mountain pastures
Bridge location: |
The bridge is situated in the north of Taldysuu village in the Taldysuu canyon. There are 8 km between the bridge and Taldysuu village.
Corresponding number on the general plan: № 53.
Administrative area: Tyup raion of Issykkul oblast.
River name: Taldysuu. |
Actual condition of the bridge/road |
There is necessary to construct a new wood bridge for preparing timber and having an access to the high mountainous regions. |
Coverage of high mountain pastures |
The bridge cover about 1 200 ha of woodlands and high mountain pastures. The location is used for grazing, haying and forest tree nursery. The entire location is at 2 300 m above sea level. |
Actual users on the location |
The main users of the bridge are: local population of Taldysuu and Ichkesuu and other below located villages. |
Other potentialities for the use of the location |
With the renovated bridge there are potentialities for different income generating activities as beekeeping and the development of the forest tree nursery. |
Bridge operation |
The daily carrying capacity of the bridge is about 15 cars (Ural, GAZ-53, KAMAZ, UAZ, tractor), trucks of 15 tons; it is also used for passers-by, including tourists, and horse riders. |
Budget review |
Budget item |
Costs in US$ |
Machinery: |
389,00 |
Wood (was supplied by local forestry) |
892,00 |
Materials |
118,00 |
Overheads: |
50,00 |
Wages: |
503,00 |
Travel: |
50,00 |
Development and survey works: |
400,00 |
Total: |
2402,00 |
Exchange rate of Som/US$: 42,6/1
Costs were covered by users themselves account for US1351,00$ |
Project evaluation by the CAMP |
Appendix |
- Location plan (outline)
- Detailed budget in Soms
- Additional photographs
- Agreement regarding the activities to be implemented by users themselves
|
|