CAMP

Reconstruction / new construction of bridges on the roads to high mountain pastures

 

 

Bridge location:

The road from Barskoon village to Taarylga canyon of Jety-Oguz rayon.

Corresponding number on the general plan: ¹ 45.

Name of aiyl okmotu: Barskoon aiyl okmotu.

River name: Taarylga.



Actual condition of the bridge/road

Along the entire 2 km of the road there are channels formed by rainwater, which makes it difficult to pass. Profiling and a sand and gravel layer are required.

Coverage of high mountain pastures

The road and the bridge cover about 1 000 ha of woodlands and high mountain pastures. The location is used for grazing, haying and forest tree nursery. The entire location is at 2 300 m above sea level.

Actual users on the location

The main users of the bridge are: Barskoon aiyl okmotu, “Toluk” peasant farm.

The total number of the users is 6 farms.

Other potentialities for the use of the location

With the road and bridge being improved there will be potentialities for beekeeping, harvesting of medicinal herbs and the development of the forest tree nursery.

Bridge operation

The daily carrying capacity of the bridge and the road is 20 cars (Niva, UAZ), trucks of 15 tons; it is also used for passers-by and horse riders.

 

 

 

Budget review

Budget item

Costs in US$

Machinery:

1077

Materials:

---

Overheads:

55

Planned accumulations:

209

Wages:

161

Taxes:

404

Travel:

90

Development and survey works:

399

Total:

2395

 

 

Exchange rate of som/US$: 48/1

Costs to be covered by users themselves account for 617$

Project evaluation by the CAMP

Appendix

  1. Location plan (outline)
  2. Detailed budget in soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves