CAMP

Reconstruction / new construction of bridges on the roads to high mountain pastures

 

Bridge location:

The road from Barskoon village to Tamga village through Barskoon canyon of Jety-Oguz rayon.

Corresponding number on the general plan: № 43.

Name of aiyl okmotu: Barskoon aiyl okmotu.

River name: Barskoon.



Actual condition of the bridge/road

The pillars of the bridge have been washed away having sunk being in emergency situation. New construction is required.

Coverage of high mountain pastures

The road and the bridge cover about 2 000 ha of arable land and hayfields. It is used for grazing, farming and haying. The entire location is at 1 900 m above sea level.

Actual users on the location

The main users of the bridge are: Barskoon, Tamga aiyl okmotu.

The total number of the main users is 2 farms.

Other potentialities for the use of the location

With the bridge and the road being improved the road to the land plots of half of the population of Barskoon village will be shortened by 7 km rather than the detour road.

Bridge operation

The daily carrying capacity of the bridge and the road is upto 40 cars (Niva, UAZ), trucks of 15 tons; it is also used for passers-by and horse riders.

 

 

 

 

Budget review

Budget item

Costs in US$

Machinery:

963

Materials:

1884

Overheads:

441

Planned accumulations:

508

Wages:

391

Taxes:

1118

Travel:

208

Development and survey works:

1104

Total:

6622

 

 

Exchange rate of som/US$: 48/1

Costs to be covered by users themselves account for 1130$

Project evaluation by the CAMP

Appendix

  1. Location plan (outline)
  2. Detailed budget in soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves