CAMP

Reconstruction / new construction of bridges on the roads to high mountain pastures

 

 

Bridge location:

The road from Jergalan village along Tulpar-Tash canyon of Ak-Suu rayon.

Corresponding number on the general plan: ¹ 42.

Name of aiyl okmotu: Possoviet Jergalan aiyl okmotu.

River name: ---.


Actual condition of the bridge/road

The road has been washed away in some sections, rockslides make it difficult to pass along the entire 2 km length of the road. Profiling and additional sand and gravel mixture are required.

Coverage of high mountain pastures

The road and the bridge cover about 2 000 ha of high mountain pastures. The location is mainly used for stockbreeding, haying and logging. The entire location is at 2 500 m above sea level.

Actual users on the location

The main users of the road are: Possoviet Jergalan, the inhabitants of the nearest villages Zyndan, Sovetskoe, Jergalan and Ak-Suu forestry.

The total number of the main users is 6 farms.

Other potentialities for the use of the location

With the bridge and the road being improved there will be potentialities: for stockbreeding, harvesting of medicinal herbs, tourism and logging.

Bridge operation

The daily carrying capacity of the bridge and the road is 10 cars (Niva, UAZ), trucks of 15 tons, four – five times a year the bridge is used for livestock migration, it is also used for passers-by and horse riders.

Budget review

Budget item

Costs in US$

Machinery:

1077

Materials:

---

Overheads:

55

Planned accumulations:

209

Wages:

161

Taxes:

404

Travel:

89

Development and survey works:

399

Total:

2394

 

 

Exchange rate of som/US$: 48/1

Costs to be covered by users themselves account for 953$

Project evaluation by the CAMP

Appendix

  1. Location plan (outline)
  2. Detailed budget in soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves