CAMP

Reconstruction / new construction of bridges on the roads to high mountain pastures

 

 

Bridge location:

The road from Barskoon village to Karakol (syrts) of Jety-Oguz rayon.

Corresponding number on the general plan: № 34.

Name of aiyl okmotu: Barskoon aiyl okmotu.

River name: Sary-Tor.




Actual condition of the bridge/road

Half of the existing concrete bridge and the access road to it have been washed away. Bearing pillars, span construction and reinforcement of the access road are required.

Coverage of high mountain pastures

The road and the bridge cover about 60 000 ha of high mountain pastures. The location is used for grazing during the entire year. The entire location is at 3 500 m above sea level.

Actual users on the location

The main users of the bridge are: Barskoon, Tamga aiyl okmotu, travel agencies.

The total number of the main users is 6 farms.

Other potentialities for the use of the location

With the bridge and the road being improved there will be potentialities: for stockbreeding (yaks), harvesting of medicinal herbs, tourism and tourist hunting.

Bridge operation

The daily carrying capacity of the bridge and the road is 20 cars (Niva, UAZ), trucks of 15 tons; it is also used for passers-by and horse riders.

 

 

 

Budget review

Budget item

Costs in US$

Machinery:

752

Materials:

996

Overheads:

86

Planned accumulations:

160

Wages:

124

Taxes:

518

Travel:

92

Development and survey works:

545

Total:

3273

 

 

Exchange rate of som/US$: 48/1

Costs to be covered by users themselves account for 533$

Project evaluation by the CAMP

Appendix

  1. Location plan (outline)
  2. Detailed budget in soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves