CAMP

Reconstruction / new construction of bridges on the roads to high mountain pastures

 

Bridge location:

The road from Engilchek village to Tash-Koro section along Kaiyndy (Sary-Jaz) canyon of Ak-Suu rayon.

Corresponding number on the general plan: ¹ 32.

Name of aiyl okmotu: Boz-Uchuk, Ak-Chiy aiyl okmotu

River name: Kaiyndy.


Actual condition of the bridge/road

The bridge is in a fairly working condition; the flooring is worn out being required to be replaced.

Coverage of high mountain pastures

The road and the bridge cover about 10 000 ha of high mountain pastures. The location is mainly used for yak breeding. The entire location is at 3 100 m above sea level.

Actual users on the location

The main users of the bridge are: Boz-uchuk, Ak-Chiy aiyl okmotu and individual stockbreeders of Ak-Suu rayon. The total number of the main users is 6 farms.

Other potentialities for the use of the location

With the bridge and the road being improved there will be potentialities: for stockbreeding, harvesting of medicinal herbs, tourism and tourist hunting.

Bridge operation

The daily carrying capacity of the bridge and the road is 5 cars (Niva, UAZ), trucks of 15 tons, four – five times a year the bridge is used for livestock migration, it is also used for passers-by and horse riders.

 

 

 

Budget review

Budget item

Costs in US$

Machinery:

287

Materials:

191

Overheads:

74

Planned accumulations:

69

Wages:

53

Taxes:

175

Travel:

35

Development and survey works:

176

Total:

1060

 

 

Exchange rate of som/US$: 48/1

Costs to be covered by users themselves - No

Project evaluation by the CAMP

Appendix

  1. Location plan (outline)
  2. Detailed budget in soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves