CAMP

Reconstruction / new construction of bridges on the roads to high mountain pastures

 

 

Bridge location

The road from Kichi-Jargylchak along Kichi-Jargylchak canyon of Jety-Oguz rayon

Corresponding number on the general plan: ¹ 3.

Name of aiyl okmotu: Ak-Terek aiyl okmotu

River name: Kichi-Jargylchak.




Actual condition of the bridge/road

The bridge bearing pillar and the span construction have been fully destroyed. The laid down logs provide passing. New construction is required.

Coverage of high mountain pastures

The road and the bridge cover 4 000 ha of woodlands and mountain pastures. It is used for grazing, haying and logging. The entire territory is located at 2 200 m above sea level.

Actual users on the location

The main bridge users are: Ak-Terek aiyl okmotu, Jety-Oguz aiyl okmotu, local community of Kichi-Jargylchak village.

The total number of the main users is 5 farms.

Other potentialities for the use of the location

With the bridge and road being repaired there will be new potentialities for bee keeping, harvesting of medicinal herbs,berries and mushrooom, the development of tourism and stock-breeding.

Bridge operation

The daily carrying capacity of the bridge is 10 cars (Niva, UAZ), trucks of 15 tons, four – five times a year the bridge is used for livestock migration, it is also used for passers-by and horse riders.

Budget review

Budget item

Costs in US$

Machinery:

601

Materials:

708

Overheads:

372

Planned accumulations:

395

Wages:

304

Taxes:

682

Travel:

190

Development and survey works:

650

Total:

3902

 

 

Exchange rate of som/US$: 48/1

Costs to be covered by users themselves account for 692$

Project evaluation by the CAMP

Appendix

  1. Location plan (outline)
  2. Detailed budget in soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves