CAMP

Reconstruction / new construction of bridges on the roads to high mountain pastures

 

 

Bridge location:

The road to Koilu village along Koilu (Sary-Jaz) canyon pf Ak-Suu rayon.

Corresponding number on the general plan: ¹ 24.

Name of aiyl okmotu: Unified peasant farm “Ak-Bulak” aiyl okmotu.

River name: Koilu.



Actual condition of the bridge/road

The road of 17 km long has been washed away in some sections with rainwater from mountain slopes; slide-rocks make it difficult for the traffic. The traffic way of the road needs to be profiled.

Coverage of high mountain pastures

The road covers about 7 000 ha of high mountain pastures. The location is used for grazing. The entire location is at 3 000 m above sea level.

Actual users on the location

The main users of the bridge are the Unified peasant farm “Ak-Bulak” and individual stockbreeders of Ak-Suu rayon.

The total number of the main users is 6 farms.

Other potentialities for the use of the location

With the road being improved there will be potentialities: for stockbreeding, harvesting of medicinal herbs, tourism and tourism hunting.

Bridge operation

The daily carrying capacity of the bridge is 5 cars (Niva, UAZ), trucks of 15 tons, four – five times a year the bridge is used for livestock migration, it is also used for passers-by and horse riders.

 

Budget review

Budget item

Costs in US$

Machinery:

2480

Materials:

---

Overheads:

117

Planned accumulations:

105

Wages:

81

Taxes:

652

Travel:

163

Development and survey works:

---

Total:

3598

 

 

Exchange rate of som/US$: 48/1

Costs to be covered by users themselves account for 175$

Project evaluation by the CAMP

Appendix

  1. Location plan (outline)
  2. Detailed budget in soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves