CAMP

Reconstruction / new construction of bridges on the roads to high mountain pastures

 

 

Bridge location

The road from Svetlaya-Poliana along Chon-Kyzyl-Suu canoyn.

Corresponding number on the general plan: ¹ 18

Farm name: Svetlaya-Poliana village government.

River name: Chon-Kyzyl-Suu.




Actual condition of the bridge/road

A wooden bridge of 7 m length has been destroyed by 80% (bearing pillars and bridge span are decayed). New construction is required.

Coverage of high mountain pastures

The road and the bridge cover 7 000 ha of woodlands and mountain pastures. It is used for grazing, haying and logging. The entire territory is located at 2 400 m above sea level.

Actual users on the location

The main bridge users are: Svetlaya-Poliana and Kyzyl-Suu aiyl okmotu, Jety-Oguz forestry and a weather station.

The total number of the main users is 5 farms.

Other potentialities for the use of the location

With the bridge and road being repaired there will be new potentialities for bee keeping, harvesting of medicinal herbs, tourism and development of the hot water spring.

Bridge operation

The daily carrying capacity of the bridge is 20 cars (Niva, UAZ), trucks of 15 tons, four – five times a year the bridge is used for livestock migration, it is also used for passers-by and horse riders.

 

 

Budget review

Budget item

Costs in US$

Machinery:

838

Materials:

1444

Overheads:

803

Planned accumulations:

866

Wages:

666

Taxes:

1365

Travel:

400

Development and survey works:

1276

Total:

7658

 

 

Exchange rate of som/US$: 48/1

Costs to be covered by users themselves account for 609$

Project evaluation by the CAMP

Appendix

  1. Location plan (outline)
  2. Detailed budget in soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves