CAMP

Reconstruction / new construction of bridges on the roads to high mountain pastures

 

Bridge location:

The road from Saruu village to Kashka-Suu canyon of Jety-Oguz rayon.

Corresponding number on the general plan: ¹ 11.

Name of aiyl okmotu : Saruu aiyl okmotu.

River name: Juuku




Actual condition of the bridge/road

A wooden bridge of 7 m length has been destroyed, a new construction is required.

Coverage of high mountain pastures

The road and the bridge cover 6 000 ha of woodlands and mountain pastures. It is used for grazing, haying and logging. The entire territory is located at 2 500 m above sea level.

Actual users on the location

The main users of the bridge are: Saruu, Darhan, aiyl okmotu, Jety-Oguz forestry, tourists. The total number of the main users are 5 farms.

Other potentialities for the use of the location

With the bridge and road being repaired there will be new potentialities for bee keeping, harvesting of medicinal herbs, tourism and hiking.

Bridge operation

The daily carrying capacity of the bridge is 10 cars (Niva, UAZ), trucks of 15 tons, four – five times a year the bridge is used for livestock migration, it is also used for passers-by and horse riders.

 

 

 

 

Budget review

Budget item

Costs in US$

Machinery:

847

Materials:

1205

Overheads:

701

Planned accumulations:

714

Wages:

549

Taxes:

1173

Travel:

348

Development and survey works:

1107

Total:

6644

 

 

Exchange rate of som/US$: 48/1

Costs to be covered by users themselves account for 368$

Project evaluation by the CAMP

Appendix

  1. Location plan (outline)
  2. Detailed budget in soms
  3. Additional photographs
  4. Agreement regarding the activities to be implemented by users themselves